Upgrading of the existing 2X72MW, 11/220kV power station. The project is intended to realize an extra 10MW per unit so as to achieve total of 160MW from this power station. Our team was involved in the recovery of old 11kV power cables from generator to the step-up transformer and installation, testing and commissioning of new ones.
We are also involved the assembling, testing and commissioning of the new 100MVA power transformer.