Installation, Testing and commission of electrical switchgear and equipment at the new substation:

• 66kV circuit Breaker- 2 No.
• 66kV isolators -5 No.
• 66kV earth Switch -4No.
• 66kV Current Transformer- 6No.
• 66kv gantry +Al tubes for bus-bars, post insulators
• Steel Structures for support for all the equipment
• 66kv Line Traps- 2No.
• 66kv Surge Arresters -12 No
• 66kv Line/Transformer protection panel -2No
• 66kV control panel- 2 no.
• 66KV S/C CABLES 300MM sq – 720m laid, Tested and terminated
• 66kv sealing ends -12 No
• 11KV NCT -2No
• 11kv neutral link-2No
• Switchboard panel for 11kv incomer bay-2No
• 11kv surge arresters-54No
• Auxiliary transformer 100KVA, 11/0.415kv-2No
• 11kv Fuse switch for auxiliary transformer.
• Switchboard panel for 11kv bus sectionaliser feeder
• Switchboard panel for 11kv feeder MV power cables between transformer and switchgear.-13No.
• Local Control System
• Control and measuring Cables
• AC supply
• DC supply
• Material for earthing system- 1500M
• Ancillary equipment
• Lighting mast
• 11kv S/C Cables. 630 mm2
• 11kv 3c cables 300mm2
• 11kv sealing ends/terminations for 7 feeders